ProjectProfy.ru
ProjectProfy.ru
2300 « »
CMM (oce IT-eeepa)

CMM. Kee peoa

Ocae ex peoa yye aeca pooca epe popaoo oecee

poc a ocoe oaoo oca caapa:

The Capability Maturity Model: Guidelines for Improving the Software Process.
Carnegie Mellon University. Software Engineering Institute. Addison-Wesley

M oa eoope oeap o cooa MS Project, o ee ypco.

poe Kee peoa ypo oce peoa
Level1

Haa

Initial

He, eypaea papaoa Ha ao ypoe axoc 70% oa papao O. cex ocaec oo aeca epcoaa.
Level 2

poe oopeoc

Repeatable

paee peoa Requirements managment Tpeoa ccee cpyc coca eoe eoe c ao peaa.

Ec peoa ec, o eec a.

Tpeoa oyepoa.

Level 2 apoae poeo

Software project planning

Bce aa o peaa oyepyc e aa.
Peoey a ao ae cooa MS Project
Level 2 Oceae aa epoec opo

Software project tracking and oversight

oyepyec cocoe poea (oee aa) o peyaa opox ocopo.
Peyaa ocopa oo cpoa  MS Project
Level 2 Cyopaoe ypaee

Software subcontract managment

Meeep coe oca ooopeoc o cpoax (eax) aa. 3aaa oe pa a oo p ooo coac.
Moo cooa Team Inbox (Team Assign) aoaa coacoa aa MS Project
Level 2 Kopo aeca

Software quality assurance

pya opo aeca oa cpaa poy c oyepoa peoa.

Peya ecpoa cooac eeepy coe.

peae. Ha Level 2 coepe ep ecpoa e oa ec pe oo co cacec yeo. Oao peyec oyepoa o e a-ca poo pepeccoe ecpoae.

Level 2 paee epc oypa poya

Software configuration managment

oyepyc ee poya pax epcx. Cyecye ocae o poya o aoo epc.
Level 3

poe opeee Defined

Hacpoa opaaoo cpyyp a poecc papao

Organization Process Focus

pooc cooece c exooe ee poeo opaaoa cpyypa oa (coac eoxoe opaee, epepacpeeec oeceoc).

Beec o ye, a poeo opa, a opaaox epop, ax a oyee, apopoae ox cpec.

pooc cooca oea aa, oea ox cpec papao, coc peya oye, copac a cex py.

aa opa oa paeea epaoao ae ax, a ocoe ao cac pooc cpae aa opaa

Moo peoeoa e a coecoo apoa MS Project Central. Heoxoo coa e epoe y pecypco.

Level 3 Ocae opaaooo poecca papao

Organization Process Definition

oyepyec caap poecc papao.

oye caca o opaa poecca copac eo xpae ocyo papaoa.

epoec o peyaa cacecx ae a oee ao cooce pao pooc epecop eeo caapoo poecca papao.

Ceye oe, o CMM e peypye eo aaecx pao, a opeee oo opaaoe eo ee aa poepoa. Moo opeoeoa aece aaecx caapo UML IDEF.

Level 3 popaa oye

Traning Program

Coaco opeoc poeo cocaec popaa oye.

Beec ye peyao ecpoa cepa.

pooc epoec ay popa oye.

Ec e apeeppoa pe a oyee, o epcoa ye caooyac poex ee. o pee "eo" oep pee (eypaeoc poea), oy aecy oye a.

Level 3 eppoaoe ypaee poea exooe

Integrated Software Managment

p apoa poeo coyec oyepoa caap poecca papao.

poee a cpoc a coao opaaoo cpyype.

o oyepoao poeype paaec exoo papao coyec oea pco, pecoo y, cooc pooeoc pao. aoe yepee e poope py cyopaoo ypae. p aa peyec yepee cex copo, o ocyee cpoo e eec o caapx opao.

Papaaaee a yac ceao epoeo ae ax.

oea paoa aox oyeo T3, ooopa .. oe pco o PERT-exe opeee pecoo y oo cooa MS Project.

Level 3 Texoo papao

Software product engineering

oyepyec exoo papao. Ocae exooece ca coyc p apoa. Texoo oa oca:
  • aay (poopoa, eoo, oe, ceape oca)
  • xpaee cxox eco epc cce
  • opoae (cpyyppoae oopoe cooae)
  • ecpoae epa: oyoe epaooe ecpoae, cceoe ecpoae (a a. ecax), ce oa, ec cooec.
    epecee peoa ecpoa oaee
  • opaa oyepoa

Ha ae oyepoao exoo cpoc a. Beec ye eeo ex ecpoae opo ocopa exooecoo coco (peer reviews).

B MS Project peoey e oee exooece ca (aaa, poepoae ..) e mile stone (opox oe).

Level 3 Mepyooe ypaee

Intergroup Coordination

Tpeoa ooae yepac peaa poy ce pya papao.

Tpeoa ooae pac oopeeo c coaee ey pya o peaa.

eep exooece poe a ce pao py oea x ycpaee.

Level 3 epoec ocop exooecoo coco

Peer reviews

pooc exooeca ce coco poeo.

Bee ee pecppyc.

Level 4

poe ypae

Managed

Mepec poecc pae Papaoo

Quantitative Process Managment

o yeo opa oeceaeo Level 4 eec cecopo caca.

Bcc aoe cacece oaae caapoo poecca papao. Ha ocoe cpae c eec ypaee poea.

Ha ao ae yo ocooac aoeo caco ee poeo Microsoft Project. ocpo cacece oe o pa exooec ca, oo oy peae poepee pao oe pyoeoce. x ceye cooa aece aox p oceye apoa.

Level 4 paee Kaeco

Software Quality Managment

Beec cacec aa pax apaepo aeca poyo.

oyee ae cpaac c ao oaae.

Ha ocoe oyex ax occ oppe exooecx poecc eo peaa poeo.

Ha ao ae eoxoo ay pecpa eeo eppoa c SQL Server oy cacy o a eeo, aecy oye ..

Level 5

poe oa

Optimizing

peopaee eeo

Defect Prevention

Beec aa cacec ye p ooe eeo.

Bee p eeo papyc o popea ycpac opaao epop.

ooeoo cacecoo aaa eeo, peyec opee, ay aay o eeo oe ec QA.

Level 5 paee ceo exoo

Technology Change Managment

pooc aooe apopoae ox exoo. Peya apopoa pecppyc.

pooc aooe epee ox exoo, oope oaa coe peya.

ee pecpa peyao apopoa oo cooa Windows SharePoint Services